BCG30203 Certificate III (Carpentry)
19 Core competency and 11 elective units must be completed. If you completed Cert I (Off-site construction) in 2008, the units shown in orange have already been accredited to your Certificate III.
Core units (19)
| code |
title |
description |
| BCGCM1001B |
Follow OH&S policies and procedures |
specifies the competency required to work safely on a General Construction site adhering to OH&S policies and
procedures. includes emergency procedures and basic risk assessment. |
| BCGCM1002B |
Work effectively in the general construction industry |
covers the competency, background and underpinning knowledge required to prepare for and sustain effective
work within the General Construction Industry. It covers the identification and clarification of the General Construction industry work
context, scope and employment conditions, the acceptance of responsibility by the individual, criteria for working in a team, individual
career path improvement activities and the participation in site meetings. |
| BCGCM1003B |
Plan and organise work |
specifies the competency required to plan allotted tasks to maximise personal productivity on a General
Construction site. includes pre work planning, safe and efficient work sequencing. |
| BCGCM1004B |
Conduct workplace communication |
specifies the competency required to communicate effectively with other workers in a general construction
workplace environment. includes gathering, conveying and receiving information through verbal and written forms of
communication. |
| BCGCM1005B |
Carry out measurements and calculations |
specifies the competency required to carry out measurements and perform simple calculations to determine
task and material requirements for a job in a General Construction work environment. |
| BCGCM2001B |
Read and interpret plans and specifications |
specifies the competency required to read and interpret plans and specifications relevant to General
Construction operations. The unit includes the identification of types of plans and drawings and their functions, the recognition of
commonly used symbols and abbreviations, the identification of key features and specifications on a site plan, the comprehension of
written job specifications and the recognition of document status and amendment detail. |
| BCGCA2001B |
Handle carpentry materials |
specifies the competency required to safely handle and store carpentry materials. Apply environmental management
principles associated with carpentry materials and components. The unit includes preparing material for mechanical handling. |
| BCGCA2002B |
Use carpentry tools and equipment |
specifies the competency required to safely select and use carpentry tools and equipment. The unit includes
hand tools, power tools, pneumatic tools, plant and equipment. |
| BCGCM2007B |
Use explosive power tools |
specifies the competency required to apply safe and effective operation of explosive power tools used to fasten
materials or fix fasteners to bases of concrete, masonry or steel. The unit includes both direct action and indirect action explosive
powered fastening tools. |
| BCGCO2003B |
Carry out concreting to simple forms |
specifies the competency required to safely install formwork, reinforcement, place and finish concrete for the
construction of minor slabs, pathways and other minor works to a specified design finish. The unit includes positioning the truck,
placement of concrete from truck to work area, spreading of concrete and site clean up. |
| BCGCM2002B |
Carry out excavation |
Undertake hand excavation tasks and excavations requiring the assistance of plant machinery to form excavations for footings and the provisions of services.
Includes excavation to new and existing sites, new or diversion of existing services. |
| BCGCM2008B |
Erect and dismantle restricted height scaffolding |
Provide work platforms for various occupational applications.
Placement of safety barriers and modular scaffolding restricted to a height of 4 metres. |
| BCGCA3001B |
Carry out general demolition of minor building structures |
General demolition work to facilitate alterations, extensions and additions to a building.
The unit includes work being completed to a schedule, plans and specifications. |
| BCGCA3002B |
Carry out setting out |
Identify site boundaries and survey indicators, establishing, measuring and setting up of profiled set outs for buildings and structural components of building work.
Includes positioning of a building and associated structures on a site. |
| BCGCA3004B |
Construct wall frames |
Plan, prepare, set out, construct and erect load bearing and non load bearing wall frames for the different types of loadings determined by the roof top and bracing configuration.
Includes set out, cutting and fabrication of both timber and metal wall frames, the erection, connection and bracing of wall frames to specifications. |
| BCGCA3005B |
Construct ceiling frames |
Plan, prepare, set out, construct and erect ceiling frames to accommodate ceiling joists, hanging beams, strutting beams and composite beams.
The unit includes the selection of members and the setting out of the ceiling frame in conjunction with the roof members. |
| BCGCA3007B |
Construct a pitched roof |
Select, set out, construct and erect pitched roofs to accommodate roof coverings for waterproofing purposes.
The unit includes scotch valley gable, hip and valley, broken hip and valley and combinations thereof. |
| BCGCA3010A |
Install and replace windows and doors |
Plan,
prepare, set out and install window and door units, and to replace
window and door units to different types and styles of buildings for
access, security, weather proofing and replacement of defective
windows and doors. It includes timber and metal window and door
units. |
| BCGCA3023B |
Carry out levelling operations |
Conduct levelling procedures using the rise and fall method and the height of instrument method for the purpose of establishing correct and accurate set out of buildings, their components and preparation.
The unit includes the set up, testing and use of levelling devices and undertaking closed traverses using a range of levelling equipment. |
Elective units (11 selected out of 18)
| code |
title |
description |
| BCGCM3001B |
Operate elevated work platforms |
Safely and
effectively operate some types of elevated work platforms (EWPs) in a
variety of different terrains and situations to access isolated work areas.
The unit includes locating, setting up, operating and shutting down
EWPs.
In addition to achievement of this competency, an EWP operator may
need to obtain additional certification of training and experience before
being allowed to operate the equipment. |
| BCGCA3003B |
Install flooring systems |
Plan, prepare, set out and install timber flooring systems to support imposed loads.
The unit includes application in brick veneer, full masonry and timber frame construction. |
| BCGCA3006B |
Erect roof trusses |
Principles of roof truss construction; Preparation, placement, tying, bracing and securing of erected trusses;
Completion of trussed roof framework |
| BCGCA3008B |
Construct eaves |
Prepare, set out and construct eaves including the cutting and fixing of fascias and barges to provide a finish between the wall and the roof.
Includes boxed eaves and the finish to gable ends. |
| BCGCA3012B |
Frame and fit wet area fixtures |
Install supporting framework for fixtures and flashings associated with the wet area construction for a bath, a shower base, a sink/basin unit and preparation for wet area linings.
Includes bathroom, laundry, shower, toilet and en-suite wet areas. |
| BCGCA301B |
Install lining, panelling and moulding |
Prepare, set out and install lining and panelling to either masonry or timber/metal framed walls.
Includes the installation of mouldings to provide decorative finishes. |
| BCGCA3016B |
Construct timber external stairs |
Construct and install timber external stairs that may involve one or more flights to provide access into a structure.
Includes timber treads and stringers. |
| BCGCA3017B |
Install exterior cladding |
Install material finishes applied to the external framed wall surface for the purpose of weatherproofing and securing the building.
Includes sheet material, weatherboarding of timber, plastic, metal and fibre cement sheet. |
| BCF3009A |
Setting out of windows and doors |
Making of full size sectional set outs and setting out and marking of components in
preparation for manufacturing processes, towards the assembling of windows and doors.
It applies to timber or plastic covered timber cored material construction. |
| BCF3010A |
Manufacture components for door and window frames, doors and sashes |
Carrying out of machining and manufacturing processes to set out component
material in preparation for the assembling of window frames, sashes, doors and doorframes.
It applies to timber or plastic covered timber cored material construction. |
| BCF3011A |
Assemble doors and windows |
Assembling of manufactured component parts to construct joinery items of window
frames, sashes, doors and door frames.
It applies to timber or plastic covered timber cored material construction. |
| BCG2012A |
Make set outs |
Making of set-outs to produce a product in accordance with the relevant work
orientation.
Units to be set out are to be standard or basic type units of stock material in a variety of production areas, such as: timber and aluminium joinery, shopfronts, stairs, glasswork etc.
Set outs include full size dimensional illustrations, sectional profiles, plans and elevations and machining details |
| BCF2016A |
Prepare for off-site manufacturing process |
Prepare material for the manufacturing processes and
assembling as components to form manufactured units. |
| BCF3008A |
Identify window and door construction |
Identifying of materials and features associated with the construction of windows
and doors for internal and external purposes.
It applies to timber or plastic covered timber cored material construction. |
| BCF3009A |
Setting out of windows and doors |
Making of full size sectional set outs and setting out and marking of components in
preparation for manufacturing processes, towards the assembling of windows and doors.
It applies to timber or plastic covered timber cored material construction. |
| BCG2001A |
Prepare surfaces |
Prepare work area; prepare surface by sanding/grinding; patch holes; stop and fill surface |
| BCF3001A |
Set up static machinery |
Setting up of static shaping and finishing machinery, in preparation for machining
operations. Machines involved are used for Shopfitting, Joinery and
Stairbuilding. |
| BCF2013A |
Assemble components |
Assembling of manufactured components to form a completed constructed unit |
| BCGCM2006B |
Apply basic levelling procedures |
Plan and prepare, set up and use levelling device, clean up |
|
 |